Propellor got delivered. Making good progress on wiring.
17 Apr 2017 18.5 hours

Propellor arrived. It's going to be some time before I'm ready to mount it

Wires for the high speed data bus between the GTN (IFR GPS) and the GTX(Transponder)

Wiring up the harness for the GTX (Transponder)

More shield wires with shield drains

The backplate for the GTX all wired up and ready for install

COM radio is talking to the PFD (Primary Flight Display)

Drilled holes in the center panel for the TOGA (Take-Off/Go-Around) switch and the interior light switch/rheostat

Soldering the wires to the TOGA push button switch

All set, ready to go into the plane

Transponder, GPS, COM and PFD all talking to each other. Making progress!

Design pdevty