22 Sep 2017 64 hours

I took a full week of work off, plus the Friday before, to give myself 8 full days to perform the “big push”. Which included: moving the aircraft to the airport Mounting the tail surfaces Mounting the wings Rigging the control surfaces Finishing the work required in the wing roots Weighing the aircraft Calibrating the fuel tanks Configuring the EFIS and sensors Test running the engine All the little things along the way =) It all got done and the plane was ready for inspection and flight 9/23/2017
12 Sep 2017 3 hours

Used 3m Flamemaster 2000+ to seal the reaming holes in the firewall and wire passthroughs Installed foam in the top cowl to seal the prop governor baffle area
11 Sep 2017 3 hours

Should be easy access in case of an emergency, but out of the way and not encumbering any space from the cabin
10 Sep 2017 5 hours

Installed passenger seat pan Finished installing seat belts Vinyl wrapped left elevator Installed anti-chafe material on lightening holes that the transponder cable routes through
9 Sep 2017 7.5 hours

Wendy came down to help me vinyl wrap the control surfaces. Only few more to go Crotch strap installed. Left seat pan also installed
7 Sep 2017 6.5 hours

Installed forward canopy seals Step grip Date plate installed Installed quick drain