Started on the Horizontal Stabilizer

Today I started working on the Horizontal Stabilizer. Most of the work was on the rear spar. It involved match drilling and the doubler and the spar. Then I primed both of them and riveted them together. Afterwards I match drilled and riveted on the hinge brackets.

Deburring the rear spar

The doubler riveted to the rear spar

I used the C-Frame to rivet the hinge brackets on

The rear spar, doubler and hinges riveted on, with all parts primed.

Design pdevty