Started running wire harness. Primed side skins and longerons.

Tonight I primed the the side skins and longerons. Then I started to install systems components like the rudder cables and wiring harness while access is still good. Then Wendy came down and helped me get the assembly clecoed together for riveting.

Aft lowe skin and aft bulkhead riveted together

Side skins and lower skin/bulkhead assembly clecoed in place

The aft bulkheads and some of the systems wires

Some of the systems wires and rudder cables. All of the wire runs are loose right now because more wires may need to be added. I'll tighten everything up when the systems install is complete