Wrapped up work on the cowl
13 Aug 2017 6.5 hours

Fabricated and installed the oil door

Completed the supports for the lower cowl near the nosegear cutout

Shot some epoxy primer on the inside of the cowl, to help seal the fiberglass from grease and oil

Design pdevty