Jared's RV-14A Build
Home
(1389 Total Hrs)
Avionics
(105 Hrs)
Firewall fwd
(39.5 Hrs)
Flying
(0 Hrs)
Op 38
(8.5 Hrs)
Other
(32 Hrs)
Section 10
(51.5 Hrs)
Section 11
(6.5 Hrs)
Section 12
(23.5 Hrs)
Section 13
(14 Hrs)
Section 14
(22 Hrs)
Section 15
(18 Hrs)
Section 16
(18.5 Hrs)
Section 17
(31 Hrs)
Section 18
(54 Hrs)
Section 19
(19 Hrs)
Section 20
(32.5 Hrs)
Section 21
(29 Hrs)
Section 22
(24 Hrs)
Section 23
(25 Hrs)
Section 24
(11 Hrs)
Section 25
(15 Hrs)
Section 26
(31 Hrs)
Section 27
(15 Hrs)
Section 28
(16.5 Hrs)
Section 29
(60 Hrs)
Section 30
(21 Hrs)
Section 31
(10 Hrs)
Section 32
(20.5 Hrs)
Section 33
(12 Hrs)
Section 34
(6 Hrs)
Section 35
(30.5 Hrs)
Section 36
(11.5 Hrs)
Section 37
(11 Hrs)
Section 38
(80 Hrs)
Section 39
(7.5 Hrs)
Section 40
(32.5 Hrs)
Section 41
(8.5 Hrs)
Section 42
(11.5 Hrs)
Section 45
(24.5 Hrs)
Section 46a
(32 Hrs)
Section 47
(29 Hrs)
Section 48
(20 Hrs)
Section 49
(19.5 Hrs)
Section 53
(6.5 Hrs)
Section 55
(47.5 Hrs)
Section 56
(4 Hrs)
Section 6
(13.5 Hrs)
Section 7
(26.5 Hrs)
Section 8
(32 Hrs)
Section 9
(47.5 Hrs)
Shop
(9 Hrs)
Vinyl wrap
(28.5 Hrs)
Wrap up
(89 Hrs)
Picked up engine. Mounted engine on airframe!!
31 Jul 2017
6.5 hours
Firewall Fwd
#Firewall Fwd
Share
Went to the local UPS Freight terminal to pick up the engine
Got it home safe. Box opened, time to pull it out with the engine hoist
Hoisting the engine out
Engine pulled out of the box. Now it's time to install some fittings on the back of the engine, before mounting onto the plane
Lower oil fitting
Upper oil fitting
Oil pressure fitting
Fittings installed on fuel pump
Sanded paint off to attach ground strap
Fabricated prop governor bracket
Modified a 5/8" wrench, per the plans
Wendy helped me get the bolts lined up and inserted into the engine and engine mount
The engine is mounted!
Bolts torques, cotter pins installed