Work begins on wings! Fabricated wing box J-Channels
1 Nov 2016 4.5 hours

Yesterday the wing crates were delivered. Zak came over and helped me unpack and inventory everything. A couple of parts were missing and one item was back-ordered. I contacted Van’s today and there going to get the missing parts sent out to me.

Tonight I got start on the main wing spar section. I fabricated and drilled out the Wing Box J-Channels for both wings

Picture of the left wing spar

The J-Channels clamped in place for drilling

The J-Channels drilled and put away

Design pdevty