More riveting of the fuel tanks
Today Wendy and I finished riveting the ribs into the left and right tanks. We still need to rivet the J-Stiffener and attach bracket on the right tank. Then i’ll install the vent line and fuel float sensor. Then it will be time to close up the tanks.