More riveting of the fuel tanks
4 Dec 2016 7.5 hours

Today Wendy and I finished riveting the ribs into the left and right tanks. We still need to rivet the J-Stiffener and attach bracket on the right tank. Then i’ll install the vent line and fuel float sensor. Then it will be time to close up the tanks.

Wendy laying down tank sealant

Left fuel tank with ribs installed

Design pdevty