Started on the aft fuselage
Today I got started on the aft fuselage, also called the “tail cone”. It was mostly prep work like trimming and fabricated brackets. I did get to use my milling machine for something! That was fun!
This is what I've got ahead of me in the next section
![](/img/empennage/2016-09-17%2014.07.07.jpg)
These brackets had to be cut apart and trimmed and deburred
![](/img/empennage/2016-09-17%2015.09.23.jpg)
Trimmed the end off this bracket per the plans
![](/img/empennage/2016-09-17%2015.42.13.jpg)
Had to do some fabricating on this bracket. Got a chance to put all the machine a fabricating skills I've been picking up over the last year to use.
![](/img/empennage/2016-09-17%2017.19.20.jpg)
Here's what needs to happen
![](/img/empennage/2016-09-17%2017.19.29.jpg)
Set the part up in the milling machine to remove as much of the material as I could
![](/img/empennage/2016-09-17%2017.57.58.jpg)
Cutting out the section in the middle with the mill. I'll use the bandsaw to cut the angles into the middle
![](/img/empennage/2016-09-17%2018.13.53.jpg)
The finished bracket. Holes will get drilled in it later, when it's time to mount the horizontal stabilizer
![](/img/empennage/2016-09-17%2018.32.27.jpg)