Installed both elevator fairings. Began work on horizontal stabilizer tip fairings.
Today I was able to get both of the elevator tip fairings installed. Then I temporarily mounted the elevators onto the horizontal stabilizer so I could trim and fit the horizontal stabilizer tip fairings. Tomorrow I’m going to do some glass work and glass the ends in for a nice finish.
Right elevator fairing riveted on

Left elevator fairing taped in position for drilling

Holes drilled in the left elevator fairing

Left elevator fairing riveted on

Fitting and drilling the horizontal stabilizer top fairings
