Continued work on firewall
Dimpled holes in tunnel panels. Then riveted nutplates on

Countersunk the firewall angles

Riveted firewall angles to the tunnel panels

Dimpled holes in the left and right lower firewall panels

Riveted angles to the left firewall panel. Ran out of time for the night. Tomorrow I'll rivet the right side

