14 Jul 2017 4 hours

Tonight I vinyl wrapped the top back of the turtle deck to the rear window. The completes the wrapping of the fuselage!
9 Jul 2017 4.5 hours

8 Jul 2017 3.5 hours

7 Jul 2017 3.5 hours

6 Jul 2017 4 hours

5 Jul 2017 6 hours

27 Apr 2017 7 hours

Today I went to the loading dock and picked up the finish kit. I spent the evening doing inventory on the parts. Only a few small hardware items were missing. I’ll call Van’s in the morning and get that taken care of. Crate opened up. Let the digging begin! Starting to get all the parts unloaded Wendy trying on a wheel pant as a hat!
3 Apr 2017 1 hours

Tonight I only did a little bit of work on the plane. I mounted the avionics ground onto the sub-panel. The rest of the time was spent study the wiring diagrams and documentation for the Garmin avionics i’m installing. This part of the build things tend to slow down a little bit since it’s not as simple as following Van’s instructions. You have to do the engineering yourself here. Where to mount things, and how to wire them.
2 Apr 2017 5 hours

Pitot and AOA lines routed through the seat ribs. Wires in center tunnel secured Wires routed and organized through the center tunnel, up to the panel
1 Apr 2017 3.5 hours

Design pdevty