Jared's RV-14A Build
Home
(1389 Total Hrs)
Avionics
(105 Hrs)
Firewall fwd
(39.5 Hrs)
Flying
(0 Hrs)
Op 38
(8.5 Hrs)
Other
(32 Hrs)
Section 10
(51.5 Hrs)
Section 11
(6.5 Hrs)
Section 12
(23.5 Hrs)
Section 13
(14 Hrs)
Section 14
(22 Hrs)
Section 15
(18 Hrs)
Section 16
(18.5 Hrs)
Section 17
(31 Hrs)
Section 18
(54 Hrs)
Section 19
(19 Hrs)
Section 20
(32.5 Hrs)
Section 21
(29 Hrs)
Section 22
(24 Hrs)
Section 23
(25 Hrs)
Section 24
(11 Hrs)
Section 25
(15 Hrs)
Section 26
(31 Hrs)
Section 27
(15 Hrs)
Section 28
(16.5 Hrs)
Section 29
(60 Hrs)
Section 30
(21 Hrs)
Section 31
(10 Hrs)
Section 32
(20.5 Hrs)
Section 33
(12 Hrs)
Section 34
(6 Hrs)
Section 35
(30.5 Hrs)
Section 36
(11.5 Hrs)
Section 37
(11 Hrs)
Section 38
(80 Hrs)
Section 39
(7.5 Hrs)
Section 40
(32.5 Hrs)
Section 41
(8.5 Hrs)
Section 42
(11.5 Hrs)
Section 45
(24.5 Hrs)
Section 46a
(32 Hrs)
Section 47
(29 Hrs)
Section 48
(20 Hrs)
Section 49
(19.5 Hrs)
Section 53
(6.5 Hrs)
Section 55
(47.5 Hrs)
Section 56
(4 Hrs)
Section 6
(13.5 Hrs)
Section 7
(26.5 Hrs)
Section 8
(32 Hrs)
Section 9
(47.5 Hrs)
Shop
(9 Hrs)
Vinyl wrap
(28.5 Hrs)
Wrap up
(89 Hrs)
Worked on fwd lower structure
18 Feb 2017
7.5 hours
Section 28
#Fuselage
#Fwd Lower Structure
Share
Dimpled the fwd bottom skins
Rived the antenna doublers and skin stiffeners
Riveted the muffler hangar doubler to the muffler tunnel side walls
Riveted the muffler hangars to the side wall tunnels
Riveted the muffler tunnel to the left and right bottom skins
Riveted the firewall assembly to the the left and right bottom skins
Riveted the side tunnels and the cover base to the to each other and to the bottom skins
All the joints at the firewall are assembled with tank sealant to prevent oil and engine compartment 'sludge' from making it way into the cabin