Completed work on fwd lower structure

Wendy helping me rivet the forward center section and cover ribs to the bottom skins

Installed the firewall passthroughs, sealed with high-temp RTV

Fabricated stainless steel hinges for the cabin heat doors

Installed cabin heat inlets and trap doors

Riveted the battery box to the firewall

Riveted the cover panels and nutplates to the the cover ribs

Design pdevty