Continued work on the fuel tanks
5 Dec 2016 8.5 hours

Today I riveted in the J-Stiffener and tank attach bracket into the right tank. Then I installed vent line and inboard rib in both tanks. Then it Wendy came down and helped me apply sealant to all the rivet heads in the inboard and outboard rib joints. Next up I need to fit the fuel level floats, then I can install the rear baffle and Z-Brackets. I’m starting to see the light at the end of the tunnel on the tanks.

J-Stiffener and tank attach brack riveted to the left tank

Vent line installed in both tanks

Inboard rib riveted in place