Continued work on the fuel tanks
Today I riveted in the J-Stiffener and tank attach bracket into the right tank. Then I installed vent line and inboard rib in both tanks. Then it Wendy came down and helped me apply sealant to all the rivet heads in the inboard and outboard rib joints. Next up I need to fit the fuel level floats, then I can install the rear baffle and Z-Brackets. I’m starting to see the light at the end of the tunnel on the tanks.